Level 24 Heron Tower
Client: Erste Bank
Contract Administrator: Knight Frank
Period: April 2024 to June 2024
-
Strip out & remove all tenant installed partitions, floor coverings, tea points, data & small power
-
Replace any damaged raised access floor tiles and ceiling tiles.
-
Reconfiguration of M&E to CAT A layout.
-
Reconfiguration of sprinklers and fire alarm to CAT A layout.
-
Full redecoration of walls, ceilings and columns including skirting.
-
De-tacking and polishing of raised access flooring.
-
Thoroughly clean the window glazing and framing throughout.
-
Full testing & commissioning
46 Portman Square
Client: BentallGreenOak
Contract Administrator: Knight Frank
Period: November 2023 to January 2024
-
Remove and dispose of off site all blockwork and glazed partition walls providing meeting rooms, offices and tea points in order to leave the premises in an open plan layout
-
Carefully remove dot and dab plasterboard from all perimeter brick and blockwork walls
-
Strip up and dispose of off site all carpet and vinyl floor tiles
-
De-gas, decommission and remove air conditioning system
-
Repair and redecorate all base build blockwork walls
-
Install temporary marketing lighting to ground floor and basement
-
Supply & install new vinyl flooring to all WCs
-
External redecorations to timber sash windows and front door
-
Stone repairs and DOFF cleaning to ground floor facade
8th Floor Aldwych House
Client: Aldwych Investments Limited
Contract Administrator: Knight Frank
Period: April 2023 to July 2023
-
Strip out and refurbishment works to 8th Floor of Aldwych House
-
Stripping out partitions, floor coverings, tea points, tenant installed IT and small power
-
De-tacking and cleaning of raised access flooring
-
Replacement of damaged ceiling tiles and raised access floor tiles
-
Reconfiguration of M&E to suit open plan layout
-
Replacement of all spotlights throughout
-
Full redecoration of walls, ceilings and columns including skirting
Unit 19 Windsor Park Industrial Estate
Wimbledon
Client: Capital Industrial
Period: April 2023 to May 2023
-
Strip out, dismantle and remove from site the dividing wall in the warehouse
-
Strip up and remove all carpet and vinyl floor finishes from office area, stairwell, entrance lobby and WCs
-
Strip out all tenant installed small power, data and tenant installed lighting
-
Re-coat the warehouse floor slab with new epoxy paint
-
Install carpet tiles in office area, stairwell and entrance lobby.
-
Replace vinyl flooring to the WCs
-
General redecorations to walls & lining panels
-
Replace all ceiling tiles (grid to remain) in office area
-
Install new LED lighting in the warehouse and office areas
-
Install new Mitsubishi AC system to upstairs office
-
Test & certify electrical system & emergency lighting
1st Floor The Porter Building
Slough
Client: Spelthorne Borough Council
Contract Administrator: Knight Frank
Period: February 2023 to May 2023
-
Remove and dispose of off site all stud and glazed partition walls, doors and frames, providing meeting rooms, offices, break out areas, cupboards, etc. in order to leave the premises in open plan configuration.
-
Strip up and dispose of off site all carpet floor tiles and other floor finishes.
-
Re-configure heating, cooling and ventilation to suit original CAT A layout and to form a CAT A finish.
-
Re-configure the fire alarm system to suit CAT A finish and base build specification.
-
Re-configure the general and emergency lighting to CAT A finish and base build specification.
-
Remove all glue residue and soiling from raised access floor tiles following removal of the floor finishes.
-
Prepare surfaces and apply two coats emulsion paint to base build walls.
9th & 10th Floors Maritime House
Barking
Client: Be First
Contract Administrator: Knight Frank
Period: March 2023 to April 2023
-
Strip up all carpet tile coverings, including all adhesives and cart away from site.
-
Prepare raised floor ready to receive new floor coverings.
-
Supply and install new floor coverings throughout the 9th & 10th floor office space with carpet tiles.
-
Full redecoration of 9th & 10th floors offices.
Unit 6 Merton Road Industrial Estate
Wandsworth
Client: Capital Industrial
Period: January 2023 to February 2023
- Strip out & dismantle entire mezzanine structure and ground floor meeting room / lobby area
- Strip out all tenant installed small power, lighting & air conditioning
- Re-coat the warehouse floor slab with new epoxy paint
- Replace the vinyl flooring to the WCs & kitchen
- General redecorations to walls & lining panels
- Service & overhaul roller shutter
- Strip out all tenant installed small power, lighting & air conditioning
- Test & certify emergency lighting & fire alarm system
Unit 8 Menin Works Industrial Estate
Mitcham
Client: Capital Industrial
Period: January 2023 to February 2023
- Remove stud and blockwork walls
- Clean kitchen units and replace cabinet doors
- Refurbish WCs including new sanitaryware
- Re-coat the warehouse floor slab with epoxy paint
- Internal decorations including walls and columns
- Repairs to security bars and doors
- Service 2no roller shutter doors
- Reconfigure electrics and lighting to work as one unit
- Replace glazing of 2no windows at rear
Unit 19 Newington Industrial Estate
Elephant & Castle
Client: Capital Industrial
Period: December 2022 to January 2023
- Strip out all racking, ducting, furniture & chattels
- Strip out tenant installed electrics including data, power & CCTV
- Cladding repairs to flank wall where ducting was removed
- Service roller shutters and install new shutter at rear
- Light decorations of internal warehouse, WCs & kitchen
- Repaint warehouse floor
Unit 44 Wates Way
Mitcham
Client: Capital Industrial
Period: November 2022 to December 2022
Within the lease renewal the client agreed to replace defective aliminium windows with new uPVC double glazed windows. The works included additional BWIC allowances for protecting the tenant's equipment and undertaking the project while they were in situ.
6th Floor Aldwych House
Client: Aldwych Investments Limited
Contract Administrator: Knight Frank
Period: July 2022 to September 2022
-
Strip out and refurbishment works to two offices in Aldwych House
-
Stripping out partitions, floor coverings, tea points, tenant installed IT and small power
-
De-tacking and cleaning of raised access flooring
-
Replacement of damaged ceiling tiles and raised access floor tiles
-
Replacement of all spotlights throughout
-
Full redecoration of walls, ceilings and columns including skirting
39 DRURY LANE, COVENT GARDEN
Client: Mercers' Company
Contract Administrator: Knight Frank
Period: May 2022 to July 2022
- Strip out of all tenant belongings incl. all floor coverings
- Repairs / replacement works to the rear elevation walls and windows to basement and ground floor
- Refurbishment of the basement WC including reinstatement of the roof
- Damp remedial works and repairs to the basement floor, incl. levelling screed and repairs to man-hole covers
- Internal repairs and redecorations throughout including shopfront
- White box fit-out; including new floor coverings, lighting and decorations throughout
16 CRANE STREET, GREENWICH
Client: Greenwich Hospital
Contract Administrator: Knight Frank
Period: January 2022 to March 2022
The proposed works at 16 Crane Street comprised the following internal redecorations and ancillary works including:
- Bathroom replacement
- Kitchen replacement
- Plaster repairs
- Joinery repairs
- Flooring replacement
- General redecoration
UNIT B2 TRADE CITY, SYDENHAM
Client: John Lyon's Charity
Contract Administrator: Knight Frank
Period: January 2022 to Februrary 2022
The scope of works included:
• Removal of all tenant fit out including partitions, offices, meeting rooms, tea point and WCs
• Strip out tenants M&E including all lighting
• Overhaul of the roller shutter and sectional doors
• Internal repairs and redecorations including flooring repairs
• External repairs and decorations
5 LANGLEY STREET
Client: Mercers' Company
Contract Administrator: Knight Frank
Period: November 2021 to December 2021
The project at Langley Street comprised the following:
- Undertaking works via abseil
- Roof & parapet repairs
- Adapting rainwater goods (External)
- Installing rainwater goods internally to re-route rainwater to rear elevation drainage
- Masonry repairs
- Ad hoc internal finishes repairs
ONE CANADA SQUARE
LEVEL 30
Client: Canary Wharf Group
Period: April 2021 to July 2021
Level 30 of One Canada Square is the executive floor for Canary Wharf Group (CWG). Following the success of Level 31, Travill Construction was approached to refurbish half a floor (7,000 square foot) including demolition, raised access flooring, partitioning, new SAS Alugrid suspended ceilings, tape and jointing and decorating. The project was carried out in a live office environment and had to be split into three phases to ensure CWG employees could continue to operate at their headquarters. The scope of works included building four large meeting rooms, eight quiet rooms, a breakout area, “chill out” space and 74 desk spaces. The revised layout and additional desk capacity will ensure CWG staff have the necessary space to social distance upon their return to work. During the course of the project we had to adapt to challenging access requirements and changing work hours. We also had to pull off site for over two weeks due to COVID-19 notifications in line with government guidance. In spite of these setbacks we worked day and night to deliver the project within the programme and on budget.